2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010 09.12.2023 5 Ugnivska Square (Tershakivska) has been furnished Well No. 10, Ugnivska square, Tershakivska, 5 was installed; 9.3 km of DN80 gas pipeline was built, 25.10.2023 Design documentation for the development of the Semigynovsk oil field has been developed The design documentation for the arrangement of the Semigynovsk oil field and the connection of the 15.08.2023 Installation of a gas pipeline from the Dashava 608 Installation of a gas pipeline from the Dashava 608 well to the gas pipeline of the Lyubeshiv gas tr 12.06.2023 Arrangement of well No. 16 at Dibrovska Arrangement of well No. 16 at Dibrovska, Ugnivska area, 4. Well No. 16 of Dibrovskaya area Ugnivska, 08.02.2023 Reconstruction of the connection unit compressor station at the Letnya gas treatment plant Reconstruction of the connection unit of the small-sized booster compressor station (MDCS) at the Le 07.11.2022 Equipped Ugnivska Square 4 (Dibrovska) Wells No. 10, 11, 12 Dibrovsky areas Ugnivska, 5; 6.0 km of gas pipelines-loops DN80 – 200 were buil 29.09.2022 Reconstruction of the gas collection point of the Hirske GD Technological gas treatment and compression systems have been implemented at the gas gathering point 20.07.2022 Construction of gas supply of the gas treatment unit of the Rudnikovsky GF Construction of external and internal gas supply of the gas treatment unit of the Rudnikovsky GD to 02.05.2022 Reconstruction of the Grove Gas Treatment Plant with the installation of the connection node of the first stage of the BCS Reconstruction of the Grove Gas Treatment Plant with the installation of the connection node of the 23.03.2022 Gas supply to the Kolodnitsky GR UPG Construction of External and Internal Gas Supply Unit of Kolodnytsky GD to Uhersko-Opara Gas Pipelin 27.12.2021 Well 1,2 of Grabinska area was constructed Well 1,2 of Grabinska area was constructed. 7.0 km of DN100 gas pipelines were built – customer – GE 24.08.2021 Well 2 of Pidhirtsivs'ka area has been constructed Well 2 of Pidhirtsivs'ka area has been constructed. 2.3 km of DN80 gas pipelines were laid and conne 05.04.2021 Reconstruction of GTU Opara with the installation of an MDCS connection unit Reconstruction of GTU Opara with the installation of an MDCS connection unit. Two modular three-stag 27.01.2021 Reconstruction of the UKPG-Letnya Reconstruction of the UKPG-Letnya with the installation of the MDCS connection node - the customer i 14.12.2020 Reconstruction of the Bistritsky gas processing unit Reconstruction of GTU of Bystrytske GD. A Solar turbine Turbomach SA gas turbine and a gas purificat 15.07.2020 Wells No. 3,10,11,12,14,15,16 of the Hirska area were constructed Wells No. 3,10,11,12,14,15,16 of the Hirska area were constructed. 9.7 km of gas pipelines-loops and 26.02.2020 Well 8.9 of Kolodnytska area was constructed Well 8.9 of Kolodnytska area was constructed. 2.7 km of DN80 gas pipelines were built – customer – P 26.12.2019 Glynyany-2 solar power plant The construction of the Glynyany-2 solar power plant on the territory of 36.4 hectares has been comp 01.11.2019 Yavoriv-1 solar power plant The second stage of the Yavoriv-1 Solar Power Plant, which is one of the largest solar power plants 06.06.2019 Radekhivska SPS 27,72 thousand solar panels have been put into operation in Radekhivska SES - the customer of Radekh 31.05.2019 Settled by the reference number 1, 2. Rudnikovskogo gas field It was built on the highway No. 1, 2. Rudnikivskogo gas field, built 9,3 km. loops, diameters 108-15 01.03.2019 Boryslavska SPS Completed work on the construction of the Boryslav Solar Power Plant - with a capacity of 8.5 MW 01.01.2019 Glinyany SPS A solar power plant "Glinians-1", with a capacity of 3.5 MW, was built 31.12.2018 Settlement of wells #100,101,102,103 Krekhiv gas field The construction of the medium-sized town No. 100,101,102,103 of the Krekhiv gas field was construct 23.10.2018 Yavoriv SPS The first stage of the Yavoriv-1 Solar Power Plant, with a capacity of 36 MW, was built. 30.09.2018 Oblashtuvannya sverdlovyny №104 Lokachynsʹkoho hazovoho rodovyshcha 61/5000 Construction of wells number 104 of Lokachinsky gas field Construction of wells number 104 of Lokachinsky gas field, laid in 2.3 km. Loop diam. 89mm The custo 30.06.2018 Arrangement of the wells № 6.7 of the Mountain gas field Settlement of the average number 6,7 of the Mountain gas field, built 2,2 km. loops, connected to UP 26.10.2017 Staryi Sambir WPS - 2 The Old Sambir-2 wind power plant, operating at 20.7 MW, was put into operation 30.09.2017 Settlements of the number 1, 2, 3, 4 of Bystritsky gas field are arranged It was constructed with a reference number 1, 2, 3, 4 of the Bystricki gas field, and 12.6 km was bu 14.11.2016 Truskavetska heat station Built on a 1.5 MW biofuel boiler house 31.10.2016 Construction of the Beregovo gas field Wells № 1, 2, 3, 4, 5 of Berehovo Gas Area are built; 10.5 km of loops of diam. 89-108 mm were const 07.10.2016 WPS Old Sambir-1 is the second turn The second stage of the wind power plant ALL was built. Old Sambir-1, total capacity 13.2 MW 30.06.2016 Construction of pressure-sensitive gas-compressor stations at Svydnytsky field A compressed compressor station of the Svydnytsky gas field was built on the volume of compressed ga 25.06.2016 Building UPG "Kolodnitsa" The construction of UPG "Kolodnitsa", Construction of the Swedes № 1,2,3,4,5,6 Kolodnitsky 29.12.2015 Sambir SPS-2 - fourth stage The construction of the fourth stage of the solar power plant Sambir SES is completed - 2. Total cap 07.12.2015 Sambir SPS-2 - the third turn Construction of the third stage of the solar power plant Sambir SES is completed - 2. Total capacity 30.05.2015 UPG "Grabivka" Construction of external gas supply UGG "Grabivka" is a customer of PJSC "Ukartnersga 07.04.2015 Construction of the connection and commercial gas connection node at AGRS-Novoe Selo site Construction of the connection and commercial gas connection node at the AGRS-Novoe Selo site (Lviv 12.12.2014 Rava-Russkaya heat station The first boiler-house on biofuel Rava-Russian thermal power plant was put into operation. Four boil 08.12.2014 Staryi Sambir WPS - 1 The first stage of the wind power station WPS STARIY SAMBIR-1 with a capacity of 6.6 MW is put into 14.01.2014 Construction of the Starobogorodchany gas field Wells installation № 2,3,4,5,6,7,8 Staro-Bogorodchansky, Bogorodchany district, Ivano-Frankivsk regi 01.10.2013 Sambir SPS-2 - the second stage Construction of the second stage of the solar power plant Sambir SPS is completed - 2. Total capacit 31.07.2013 Construction of compressed gas compressor stations Two compressed compressor stations were built on the volume of compressed gas - 700 thousand m3 / da 26.06.2013 Sambir SPS - 2 Construction of the first stage of the solar power plant Sambir SPS-2 completed. Total capacity 5,08 20.05.2013 Sambir SPS is the second stage The second stage of the Sambir SPS with the capacity of 2 MW is launched. The total capacity of the 13.05.2013 Stari Bogorodchany-1 SPS A solar power station "Old Bogorodchany-1" was built. Capacity 2.8 MW 03.12.2012 Sambirska SPS The first stage of the Sambir SPS with the capacity of 1.1 MW was built 24.10.2012 Construction of Chaikovitska gas field The wells № 3,4,5,6 are located on the Chaikovitsky gas-bearing area; 6.8km of loops of diam. 89-108 26.12.2011 Reconstruction of gas station "Kozova" Reconstruction of gas station "Kozova", dismantling and installation of technological pipe 30.12.2010 Overhaul of the isolation of underground technological pipelines at the COP Rohatyn Overhaul of the isolation of underground technological pipelines at COP Rohatyn - customer Ukrgazpro Map of projects OUR PROJECTS ON THE MAP OF WESTERN UKRAINE Польща Румунія Угорщина Львів Україна Івано-Франківськ Well No. 10, Ugnivska square, Tershakivska, 5 was installed; 9.3 km of DN80 gas pipeline was built, a commercial gas metering unit was installed - customer - Agreement on distribution of products dated 12.31.2020 No. 7 - investor (operator) "WELL CO" LIMITED LIABILITY COMPANY 43002645 The design documentation for the arrangement of the Semigynovsk oil field and the connection of the well No. 71 was developed - the customer - "PARI NAFTOGAZ" LLC Installation of a gas pipeline from the Dashava 608 well to the gas pipeline of the Lyubeshiv gas treatment plant – Yarushychi gas distribution point. 6.4 km of DN80 gas pipeline-loop were built - the customer is Expert Petroleum Ukraine LLC Arrangement of well No. 16 at Dibrovska, Ugnivska area, 4. Well No. 16 of Dibrovskaya area Ugnivska, 4; 4.7 km of gas pipeline-loop DN80 were built – customer - Production Sharing Agreement dated 31.12.2020 No7 - investor (operator) LIMITED LIABILITY COMPANY "WELL CO" 43002645 Reconstruction of the connection unit of the small-sized booster compressor station (MDCS) at the Letnya gas treatment plant Works on the replacement of existing rental compressors have been completed - the customer is Expert Petroleum Ukraine LLC Wells No. 10, 11, 12 Dibrovsky areas Ugnivska, 5; 6.0 km of gas pipelines-loops DN80 – 200 were built, a commercial gas metering unit was arranged – customer - Production Sharing Agreement dated 31.12.2020 No7 - investor (operator) LIMITED LIABILITY COMPANY "WELL CO" 43002645 Technological gas treatment and compression systems have been implemented at the gas gathering point (UGSF) of the Gorske GD. Two technological units of silica gel gas dehydration units and two electrically driven reciprocating compressor units Safe were installed. - customer – Goryzonty LLC Construction of external and internal gas supply of the gas treatment unit of the Rudnikovsky GD to the Pukenichi-Komarno gas pipeline 0.7 km of gas pipeline-collector DN80 was built – customer PE "Project-Bud" Reconstruction of the Grove Gas Treatment Plant with the installation of the connection node of the first stage of the BCS - customer - Expert Petroleum Ukraine LLC Construction of External and Internal Gas Supply Unit of Kolodnytsky GD to Uhersko-Opara Gas Pipeline 2.3 km of gas pipeline-collector DN 200 were built – the customer is PE "Nordik" Well 1,2 of Grabinska area was constructed. 7.0 km of DN100 gas pipelines were built – customer – GEO-NADRA-INVEST LLC Well 2 of Pidhirtsivs'ka area has been constructed. 2.3 km of DN80 gas pipelines were laid and connected to the gas pipeline loop of well No. 5 Komariv of GPD Lvivgasvydobuvannya – customer – GEO-TOPO-CADSTR LLC Reconstruction of GTU Opara with the installation of an MDCS connection unit. Two modular three-stage compressor units Ariel were installed - the customer is Expert Petroleum Ukraine LLC Reconstruction of the UKPG-Letnya with the installation of the MDCS connection node - the customer is Expert Petroleum Ukraine LLC Reconstruction of GTU of Bystrytske GD. A Solar turbine Turbomach SA gas turbine and a gas purification unit from well No. 5 Bystritskaya were installed using zeolite - customer - Zakhidnadraservice LLC Wells No. 3,10,11,12,14,15,16 of the Hirska area were constructed. 9.7 km of gas pipelines-loops and collectors DN80-150 were laid – customer – GORYZONTY LLC Well 8.9 of Kolodnytska area was constructed. 2.7 km of DN80 gas pipelines were built – customer – PE "NORDIK"