Яворів-1 СЕС

23.10.2018

Збудована перша черга Сонячної електростанції "Яворів-1" потужністю 36 МВт.

Карта проектів
Наші проекти на мапі Західної України

Польща Румунія Угорщина Львів Україна Івано-Франківськ Well No. 10, Ugnivska square, Tershakivska, 5 was installed; 9.3 km of DN80 gas pipeline was built, a commercial gas metering unit was installed - customer - Agreement on distribution of products dated 12.31.2020 No. 7 - investor (operator) "WELL CO" LIMITED LIABILITY COMPANY 43002645 The design documentation for the arrangement of the Semigynovsk oil field and the connection of the well No. 71 was developed - the customer - "PARI NAFTOGAZ" LLC Installation of a gas pipeline from the Dashava 608 well to the gas pipeline of the Lyubeshiv gas treatment plant – Yarushychi gas distribution point. 6.4 km of DN80 gas pipeline-loop were built - the customer is Expert Petroleum Ukraine LLC Arrangement of well No. 16 at Dibrovska, Ugnivska area, 4. Well No. 16 of Dibrovskaya area Ugnivska, 4; 4.7 km of gas pipeline-loop DN80 were built – customer - Production Sharing Agreement dated 31.12.2020 No7 - investor (operator) LIMITED LIABILITY COMPANY "WELL CO" 43002645 Reconstruction of the connection unit of the small-sized booster compressor station (MDCS) at the Letnya gas treatment plant Works on the replacement of existing rental compressors have been completed - the customer is Expert Petroleum Ukraine LLC Wells No. 10, 11, 12 Dibrovsky areas Ugnivska, 5; 6.0 km of gas pipelines-loops DN80 – 200 were built, a commercial gas metering unit was arranged – customer - Production Sharing Agreement dated 31.12.2020 No7 - investor (operator) LIMITED LIABILITY COMPANY "WELL CO" 43002645 Technological gas treatment and compression systems have been implemented at the gas gathering point (UGSF) of the Gorske GD. Two technological units of silica gel gas dehydration units and two electrically driven reciprocating compressor units Safe were installed. - customer – Goryzonty LLC Construction of external and internal gas supply of the gas treatment unit of the Rudnikovsky GD to the Pukenichi-Komarno gas pipeline 0.7 km of gas pipeline-collector DN80 was built – customer PE "Project-Bud" Reconstruction of the Grove Gas Treatment Plant with the installation of the connection node of the first stage of the BCS - customer - Expert Petroleum Ukraine LLC Construction of External and Internal Gas Supply Unit of Kolodnytsky GD to Uhersko-Opara Gas Pipeline 2.3 km of gas pipeline-collector DN 200 were built – the customer is PE "Nordik" Well 1,2 of Grabinska area was constructed. 7.0 km of DN100 gas pipelines were built – customer – GEO-NADRA-INVEST LLC Well 2 of Pidhirtsivs'ka area has been constructed. 2.3 km of DN80 gas pipelines were laid and connected to the gas pipeline loop of well No. 5 Komariv of GPD Lvivgasvydobuvannya – customer – GEO-TOPO-CADSTR LLC Reconstruction of GTU Opara with the installation of an MDCS connection unit. Two modular three-stage compressor units Ariel were installed - the customer is Expert Petroleum Ukraine LLC Reconstruction of the UKPG-Letnya with the installation of the MDCS connection node - the customer is Expert Petroleum Ukraine LLC Reconstruction of GTU of Bystrytske GD. A Solar turbine Turbomach SA gas turbine and a gas purification unit from well No. 5 Bystritskaya were installed using zeolite - customer - Zakhidnadraservice LLC Wells No. 3,10,11,12,14,15,16 of the Hirska area were constructed. 9.7 km of gas pipelines-loops and collectors DN80-150 were laid – customer – GORYZONTY LLC Well 8.9 of Kolodnytska area was constructed. 2.7 km of DN80 gas pipelines were built – customer – PE "NORDIK"

ТОВ НОРДІК-БУД

© 2019-2023 Товариство з обмеженою відповідальністю «НОРДІК-БУД»
Усі права застережено.

79005, Україна, м. Львів
вул. Шота Руставелі, 7
тел.: (032) 261 04 99,
факс: (032) 261 06 50
E-mail: info@nordikbud.com.ua

Розроблено в ABK-Technologies